Power Net Method

Introduction to construction methods that can handle collapses with a presumed slip layer thickness of 1.5m or less as the standard.

This technology is a method to prevent overall landslides that occur across the entire surface layer of a slope, as well as localized collapses that occur within a narrow range between full-threaded deformed steel nails (hereinafter referred to as "nails"). It consists of an effective assembly of components against surface layer collapses by connecting and combining high-strength wire mesh, nails, spike plates, and other materials. There are two types of methods: one that addresses surface sliding using wire mesh and another that addresses falling stones and floating rocks using spider nets. 【Features】 ■ Designed to respond to collapses with an assumed sliding layer thickness of 1.5m or less ■ Effective component configuration against surface layer collapses *For more details, please refer to the PDF materials or feel free to contact us.

  • Civil Engineering Method

ブックマークに追加いたしました

ブックマーク一覧

ブックマークを削除いたしました

ブックマーク一覧

これ以上ブックマークできません

会員登録すると、ブックマークできる件数が増えて、ラベルをつけて整理することもできます

無料会員登録

Spider web net construction method

Preventing the collapse of soil blocks! We respond to collapses with a standard assumed slip layer thickness of 3.0m or less.

The technology combines high-strength nets with spider plates and reinforcement materials to create a ground reinforcement soil engineering method designed to prevent surface collapses at depths of 3.0 meters or less. It is considered that the overall stability is resisted by the reinforcement work, and the resistance to gaps between reinforcement materials is provided by the tensile strength of the high-strength net. Additionally, the resistance is effective at the intersections of the spider plates and high-strength nets. The spacing of the reinforcement materials is a maximum of 2.0 meters. 【Features】 ■ Addresses collapses with an assumed slip layer thickness of 3.0 meters or less ■ Relatively suppresses landslides with low loads ■ Maintains a beautiful landscape as no concrete structures are laid on the slope ■ Eliminates the need for concrete laying or rebar assembly on the slope ■ Facilitates construction management and shortens construction periods, leading to cost reductions *For more details, please refer to the PDF materials or feel free to contact us.

  • Civil Engineering Method